Historical information
The Kiewa Hydro Electric Scheme was constructed by the SECV
Physical description
Booklet of 40 pages typed on both sides and including 4 maps at the back. It has a black plastic spiral spine and black back cover. Title on the front followed by 'Evolution of Layout and Design, Personalities / Of Early Days and Future Possibilities' followed by the author