Document - Report, Yan Gaoulil, Conservation Management Plan for The Tramway Signal Cabin, Apr. 2017

Physical description

Report - 28 A4 pages, double sided stapled in the top left hand corner titled "Conservation Management Plan for The Tramway Signal Cabin, Waiting Shelter and Conveniences at Swanston Street and Victoria Street Melbourne". Prepared by Yan Gaoulil as part of an assignment when undertaking Conservation Management Plan studies.



Provides a introduction to the study, history, description, significance, Key Issues, Policy, implementation for the conservation of the building. Includes a Bibliography and Appendices.



A second set of documents, five pages stapled in top left hand comer, lists correspondence between the Author and the Museum commencing Dec. 2016.

Back to top