Historical information

The document looks at the costs of operating trams including reconstruction, trolley-buses, and petrol buses in Ballarat. Dated 7/10/1932. Considers the costs of tramway reconstruction - the minimal work needed (88500 pounds), current ESCo traffic expenses and income, cost of a trolley bus system including 25 buses and road pavement (100,450 pounds) and 25 petrol buses including costs of scrapping the existing per way and overhead (64,450 pounds). Concluded that reinstatement of the system along the lines of that of Bendigo was the best option. Includes costs and revenue predictions.

Significance

Demonstrates a document prepared in 1932 to consider the future of the Ballarat Tramway system.

Physical description

Nine pages of a carbon copy document - first page missing.