Physical description

Letter, seven pages, 5 September, 1983, from A.C.A. Howe Australia Pty Ltd., Mining and Geological Consultants to Bendigo Mining N.L re mining lease application. Report is intended for inclusion in the prospectus dated October 1983 for issue by Bendigo Mining N.L of shares. Tenements, mineralization and mining operation on the Deborah anticline are discussed.
'The mineralization on the Bendigo goldfield was won from repetitive saddle reef structures which developed along 13 adjacent parallel anticlines in a tightly folded sequence of Lower Ordovician metasediments over a width of 4km and along strike for 19km. Within this zone the majority of the gold production has come from an 8km by 4km block centred on the city of Bendigo'