Programme - Official Opening of Wodonga Swimming Pool, 1959

Historical information

AT a Public Meeting convened by the Wodonga Shire President on 22nd February 1955 a committee was formed by the very large gathering present "to build a Swimming and Wading Pool in Wodonga to 165' x 60' size to Public Works Specifications."

This committee was named the Wodonga Swimming Pool Construction Committee. After four years of hard work and voluntary labour members of this Committee officially handed over the project on behalf of the public of Wodonga to the Construction Authority, the Wodonga Shire
Council.

The concrete pool structures were built by Contractor Mr. R. Baring, but a great deal of the work in excavating and generally preparing the area was carried out by voluntary labour. All 30,000 foam cement bricks used in the buildings were made by working bees, a large portion of the materials required were donated and most of the cartage of these materials was voluntary as well as £6,000 being raised in appeals.

The Stanley Street Pool in Wodonga officially closed on 7th April 2012 and was demolished the following year.

Significance

This item is significant because it records the Official Opening of the first swimming pool in Stanley Street Wodonga which was built by volunteers for the community.

Physical description

A programme produced for the Official Opening of the Wodonga Swimming Pool on 12th December 1959. It features a photograph of the Swimming Pool on the front.

Back to top