Showing 1348 items
matching mining gold gold mining
-
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATES - FORTUNA HUSTLER'S GOLD MINING CO, 21/02/1908
... HUSTLER'S GOLD MINING CO.... Fortuna Hustler's Gold Mining Co.... certificates (Nos. 2434 & 2435) issued by the Fortuna Hustler's Gold...Fortuna Hustler's Gold Mining Co.... certificates Fortuna Hustler's Gold Mining Co. R.McNair G.H.Petrie ...Document. KELLY & ALLSOP COLLECTION. Two share certificates (Nos. 2434 & 2435) issued by the Fortuna Hustler's Gold Mining Company, No Liability, Hustler's Reef Bendigo. Each certificate represents 50 shares @ 30 shillings each and issued to R.McNair of Bendigo on 21 Feb.1906. Capital raised was 42,000 Pounds from 28,000 shares. Certificates signed by G.H.Petrie, Manager. Printed by J.B.Young, Bendigo.Fortuna Hustler's Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificates, fortuna hustler's gold mining co., r.mcnair, g.h.petrie, j.b.young. -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATES - NORTH ARGUS UNITED GOLD MINING CO, 02/03/1894
... ARGUS UNITED GOLD MINING CO.... North Argus United Gold Mining Co.... certificates issued by the North Argus United Gold Mining Company...North Argus United Gold Mining Co.... certificates North Argus United Gold Mining Co. N.Kershaw J.H.Kirkwood ...Document. KELLY & ALLSOP COLLECTION. Two share certificates issued by the North Argus United Gold Mining Company, No Liability, Moon Reef, Garden Gully Line, Eaglehawk. Certificate Nos. 2131 & 2132 each of 100 shares issued to N.Kershaw of Bendigo on 2 March 1894. Each share of 10 shillings each raised 15,000 Pounds from 30,000 shares. Certificates signed by J.H.Kirkwood, Manager.North Argus United Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificates, north argus united gold mining co., n.kershaw, j.h.kirkwood. -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATES - DIXON'S GOLD MINING CO, 08/11/1895 to 27/04/1899
... GOLD MINING CO.... Dixon's Gold Mining Co.... issued by Dixon's Gold Mining Company, No Liability, Victoria...Dixon's Gold Mining Co.... Certificates Dixon's Gold Mining Co. M.Tully W.G.Blackham Victoria Reef ...Document. KELLY & ALLSOP COLLECTION. Two share certificates issued by Dixon's Gold Mining Company, No Liability, Victoria Reef, Bendigo. Both certificates issued to M.Tully of Bendigo. Certificate No. 439 - 100 shares @ 2 shillings each issued on 8 Nov.1895. Certificate No. 804 - 40 shares @ 2 shillings each issued on 27 April 1899. Capital raised was 2,400 Pounds from 24,000 shares. Each certificate signed by W.G.Blackham, Manager.Dixon's Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificates, dixon's gold mining co., m.tully, w.g.blackham, victoria reef. -
Bendigo Historical Society Inc.
Document - REPORTS TO DIRECTORS OF SNOWBALL GULLY GOLD MINING CO RE MINING DETAILS AND WINDING UP (SALE)
... REPORTS TO DIRECTORS OF SNOWBALL GULLY GOLD MINING CO RE...snowball gully gold mining company...Reports to Directors of Snowball Gully Gold Mining Co re... DOCUMENT Gold snowball gully gold mining company snowball gully ...Reports to Directors of Snowball Gully Gold Mining Co re Mining Details and Winding Up (sale); 1. 10 pages of details of mining progress (shaft sinking, drives etc) in the period 1905 - 1907 submitted by D Gummell, Manager; 2. Two pages listing the tools and implements on the mine when closed with attached letter to Directors (31/10/1907) submitted by D Gummell, Manager. Note: comment by Ralph Birrell on this second document (19/3/2013) - he observes that the sale of ''68 drills'' on the submitted list indicates that at this mine in 1905/07 they were still using drills and hammers.document, gold, snowball gully gold mining company, snowball gully gold mining company. d. gummell. ralph birrell. -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATE - SMART'S GOLD MINING CO, 04/02/1903
... GOLD MINING CO.... Smart's Gold Mining Co.... No. 113 issued by Smart's Gold Mining Company, No Liability...Smart's Gold Mining Co.... certificate Smart's Gold Mining Co. Joseph Anderson J.G.Stanfield ...Document. KELLY & ALLSOP COLLECTION. Share certificate No. 113 issued by Smart's Gold Mining Company, No Liability, Fryers, Victoria. Certificate represents 100 shares at 5 shillings each. Capital raised was 8,000 Pounds from 32,000 shares. Certificate issued to Joseph Anderson of Castlemaine on 4 Feb. 1903. Signed by J.G. Stanfield for Henry Y. North, Manager, Bendigo.Smart's Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificate, smart's gold mining co., joseph anderson, j.g.stanfield, henry y north, fryers. -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATE - PHOENIX GOLD MINING CO, 18/07/1908
... GOLD MINING CO.... Phoenix Gold Mining Co.... No. 507 issued by the Phoenix Gold Mining Company, No Liability...Phoenix Gold Mining Co.... Certificate Phoenix Gold Mining Co. Michael Kelly Hay Kirkwood Phoenix ...Document. KELLY & ALLSOP COLLECTION. Share Certificate No. 507 issued by the Phoenix Gold Mining Company, No Liability, St Mungo and Devonshire Reefs, Eaglehawk. Certificate represents 50 shares at 20 shillings each. Capital raised was 30,000 Pounds from 30,000 shares. Certificate issued to Michael Kelly of Bendigo on 18 July 1908. Signed by Hay Kirkwood, Legal Manager, High St, Eaglehawk.Phoenix Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificate, phoenix gold mining co., michael kelly, hay kirkwood -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATE - CONSOLIDATED GOLD MINING COMPANY, 28/01/1897
... - CONSOLIDATED GOLD MINING COMPANY... Consolidated Gold Mining Co.... issued by the Consolidated Gold Mining Company, Ellesmere...Consolidated Gold Mining Co.... Certificate Ellesmere Consolidated Gold Mining Co. M.Kelly J.H.Curnow ...Document. KELLY & ALLSOP COLLECTION. One share certificate issued by the Consolidated Gold Mining Company, Ellesmere, Bendigo, representing 100 shares at 10 shillings each. Capital raised was 17,500 Pounds from 35,000 shares. Certificate No. 313 issued to M.Kelly on 28 Jan 1897. Signed by J.H.Curnow, Manager.Consolidated Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificate, ellesmere, consolidated gold mining co., m.kelly, j.h.curnow -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATE - LOCKS NEW FIND GOLD MINING CO, 23/01/1911
... FIND GOLD MINING CO.... Locks New Find Gold Mining Co.... issued by Locks New Find Gold Mining Co., Sandy Creek, Maldon...Locks New Find Gold Mining Co.... New Find Gold Mining Co. Maldon Share Certificate J. Bright ...Document. KELLY & ALLSOP COLLECTION. One Share Certificate issued by Locks New Find Gold Mining Co., Sandy Creek, Maldon, representing 100 shares at 10 shillings each. Capital raised was 18,000 Pounds from 36,000 shares. Certificate No. 910 issued to J.Bright of Bendigo on 23 Jan 1911. Certificate signed by Sidney J.Plain, Manager.Locks New Find Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, locks new find gold mining co., maldon, share certificate, j. bright, sidney j.plain -
Bendigo Historical Society Inc.
Document - KELLY AND ALLSOP COLLECTION: SHARE CERTIFICATES - SOUTH LANCASHIRE GOLD MINING, 29/06/1903 to 11/07/1904
... LANCASHIRE GOLD MINING... South Lancashire Gold Mining Co.... Certificates issued by the South Lancashire Gold Mining Company...South Lancashire Gold Mining Co.... certificates South Lancashire Gold Mining Co. S.H.McGowan A.B.Harrison ...Document. KELLY & ALLSOP COLLECTION. 12 pale blue Share Certificates issued by the South Lancashire Gold Mining Company, No Liability, Armadale Gully, near Bendigo. Registered office Victoria Chambers, Bendigo. Each certificate represents 100 shares at 2/6 each. Capital raised 4,000 Pounds from 32,000 shares. Certificate No.104 issued to A.B.Harrison, Bendigo on 29 June 1903. Certificate Nos. 353 - 362 issued to R.J.A.Tonkin of Bendigo, on 23 Oct 1903. Certificate No.442 issued to W.J. Sparkman of Bendigo, on 12 April 1904. Certificate Nos. 480 - 482 issued to T.E.Williams of Bendigo on 11 July 1904. Certificates signed by the Mine Manager, S.H.McGowan.South Lancashire Gold Mining Co.business, stockbroker, kelly & allsop, kelly & allsop collection, share certificates, south lancashire gold mining co., s.h.mcgowan, a.b.harrison, r.j.a.tonkin, w.j.sparkman, t.e.williams -
Myrtleford and District Historical Society
Gold Mining Sign
... Gold Mining Sign... of gold mining sites. Myrtleford district was known to have had... in the vicinity of gold mining sites. Myrtleford district was known ...This sign was required to be displayed in the vicinity of gold mining sites. Myrtleford district was known to have had 100 sites within a ten mile radius of the town; the sign was recovered by Charlie McFadyen, a local prospector and fossicker, of some 60 yearsThe sign relates to local gold mining activity, a key source of wealth and employment from 1854 to the late 19th century. Such signs continued to be in use during the period between World War 1 and 2,including the period of the Great Depression.Tin rectangular mining sign embossed with a warningInscription: "THIS LAND IS AURIFEROUS AND SUBJECT TO MINING CONDITIONS"auriferous mining -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining ...Image of Cocks Pioneer Gold & Tin Mines NL directors with Mrs Molly Moline and children, Dorothy and Geoff. Taken at Sherwood - the mine manager's residence. (1914) Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. "COX PIONEER MINE DIRECTORS" top "GEOFF DOR (unclear) TED SHACKLE" bottommine, gold, tin, gold mining, tin mining, cockatoos, sluicing, men, women, children, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... Gold and Tin Mining Company ceased operations due to a drop... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining ...Altering course of Reedy Creek, El Dorado. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. Handwritten across the front: 'Altering course of creek. Eldorado'mining, gold, tin, sluicing, reedy creek, cocks pioneer, el dorado, eldorado, men, horses -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Horse team , Cocks Pioneer Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17 284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, sluicing, men, cocks pioneer, el dorado, eldorado, horses, gold mining, tin mining -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Pioneer Gold and Tin Mines NL, another power station... sluicing operations until 1941. mining gold tin cocks pioneer power ...Cocks Pioneer Mine El Dorado, Power Station No. 2 was established in 1914 and located near junction of Reid's and Clear Creeks, Byawatha. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. Handwritten on front: 'THE POWER STN COCKS, PIONEER MINE, ELDORADO' / 'THELMA STUDIO / [underlined] WANGARATTA'mining, gold, tin, cocks pioneer, power, sluicing, el dorado, eldorado, byawatha, thelma studios, wangaratta, gold mining, tin mining, reid's creek, clear creek -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer Creek Diversion. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, cocks pioneer, creek, gold mining, tin mining, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer Pipes and Open Cut. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64 397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, open cut, sluicing, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer New Engines, c. 1934. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64 397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, engine, electricity, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining ...Cocks Pioneer Ponds from Monument Hill. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, hydraulic, sluicing, gold mining, tin mining, monument hill, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer Barge. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, barge, sluicing, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer, 1907. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. Handwritten across front: 'HAROLD S. TEMBY / Photo'; '"COCKS PIONEER" 1907'.mining, gold, tin, open cut, barge, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer after Flood. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, barge, floods, gold mining, tin mining, cocks pioneer, el dorado, eldorado, men -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining ...Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, barge, sluicing, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining... sluicing operations until 1941. gold tin mining sluicing gold ...Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. gold, tin, mining, sluicing, gold mining, tin mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining... sluicing operations until 1941. mines mining tin gold tin mining ...Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mines, mining, tin, gold, tin mining, gold mining, sluicing, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Image of Cocks Pioneer Mine nozzle. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mines, mining, hydraulic mining, men, tin, gold, tin mining, gold mining, sluicing, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer new engines. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mines, mining, tin, gold, tin mining, gold mining, hydraulic mining, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer nozzle working. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25,000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mines, mining, miners, men, gold, tin, gold mining, tin mining, hydraulic, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph - Digital Image
... gold mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining ...Cocks Pioneer Office and Milne's horse and cart. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. Handwritten on image: COCKS, PIONEER GOLD MINE, ELDORADOmines, mining, horses, cart, transport, gold, tin, gold mining, tin mining, buildings, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph - Digital Image
... sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining... Pioneer Gold and Tin Mines NL, another power station ...C Rankins Almond Orchard & Cocks Pioneer Pond, 1930s. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2 500 000 cubic yards worked, reported recovery was 17 284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1 935 900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64 397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mines, mining, farms, farming, almonds, sluicing, rankins, cocks pioneer, el dorado, eldorado -
El Dorado Museum Association Inc.
Photograph (item) - Digital Image
... gold mining... Gold and Tin Mining Company ceased operations due to a drop... Gold and Tin Mining Company ceased operations due to a drop ...Cocks Pioneer old mine timbers. Cocks Pioneer Electric Gold & Tin Mine Company was formed in 1899. The company's first power station, located at the eastern end of the valley began operating with its 340 Kilowatt steam-powered generator. By 1909, from 2,500,000 cubic yards worked, reported recovery was 17,284 ounces of gold and 224 tons of tin ore. By 1909, Cocks Pioneer’s power plant had become inadequate and uneconomical. The barge was floated downstream about a mile, but lost time caused the operations to cease. Following testing, a new mine was established by diverting Reid's Creek at a cost of £25 000. Settling dams were built, one of which held 1,935,900 cubic feet. Sold earth banks, built against a wall of stringy bark saplings constructed and laced with vertical props, were built. In 1914, the company was reformed as Cock’s Pioneer Gold and Tin Mines NL, another power station was constructed at the western end of the township, near the junction of Clear and Reid's Creeks. From 6,800,000 cubic yards of material processed, the returns were 64,397 ounces of gold and 855 ton of tin. Cocks Pioneer mine then moved the barge downs stream and continued sluicing. In 1929 Cocks Pioneer Electric Gold and Tin Mining Company ceased operations due to a drop in values. Cock’s Pioneer Gold and Tin Mines NL carried on large-scale hydraulic sluicing operations until 1941. mining, gold, tin, open cut, gold mining, tin mining, cocks pioneer, el dorado, eldorado