Showing 437 items
matching trackworks
-
Ballarat Tramway Museum
Photograph - Digital image Set of 6, John Theodore, c1973
Yields information about the BTPS placing poles for the overhead along the access track and working on them.Set of 6 digital images scanned from 35mm slides of the installation of poles and bracket arms on the access track mid 1973. .1 - Warren Doubleday about to climb the ladder to work on a pole on the access track - note the access track which had yet to be jointed. .2 - positioning the truck etc. .3 - ditto with Geoff Cargeeg .4 - drilling holes for the poles on the access track .5 - access track looking west with the poles installed and a rather muddy area - winter 1973? .6 - drilling holes for the polestrams, tramways, btps, trackwork, depot, tramcars, overhead -
Ballarat Tramway Museum
Photograph - Digital image, John Theodore, c1973
Yields information about the BTPS constructing No. 1 road at the depot.Digital images scanned from 35mm slides of the construction of 1 road points, first half of 1973. Points and crossings installed and poles installed. Little segments of rail have been laid out to indicate the position of the track.trams, tramways, btps, trackwork, depot, overhead -
Ballarat Tramway Museum
Photograph - Digital image Set of 3, John Theodore, 19/9/1974 or shortly thereafter
Yields information about the use of tram 27 on the access track following the connection of power at the depot.Set of 3 digital images scanned from 35mm slides of the installation of the initial testing and driving of tram 27 on the access track - from Fares Please would be 19/9/1974 or shortly there after. .1 - 27 at the end of the access track - not the white stop block behind the tram. .2 - 27 crossing the level crossing with three people in the cab - Clyde Croft on the left. .3 - 27 and 14 at the depot - may not be initial date.trams, tramways, btps, trackwork, depot, tramcars, commissioning -
Ballarat Tramway Museum
Photograph - Digital image Set of 3, John Theodore, late 1973 or early 1974
Yields information about the BTPS constructing No. 1 road and moving wheel sets around and how easy it was to derail them!Set of 3 digital images scanned from 35mm slides of depot activities during late 1973 or early 1974. .1 - moving one of the spare sets of wheels around, it has become derailed on 1 road. .2 - ditto - 26 and 27 on the depot fan - person in uniform?? .3 - 26 on the depot fan - note the gauge bar on the track. Could be photographed prior to power being connected.trams, tramways, btps, trackwork, depot, tramcars, tram 26, tram 27 -
Ballarat Tramway Museum
Photograph - Digital image Set of 8, George Coop, 1968 - 1970
Yields information about the City Loop area and its operation. Eight (8) Digital images taken by George Coop during the period 1968 - 1970, of trams at the City Loop. .1 - 33, 17 and two other single truckers parked in the loop with motor vehicles and parking meters. No. 33 has an Eureka Roofing Tile Advert. .2 - 28? passing two track workers cleaning the west end points with a bogie car and three single truckers in the loop. In the background are Patersons and Dickins Food Store. .3 - No. 12 parked at the east end of the loop, hard up against the tram in front. Shows the Section Insulator. .4 - As for .1, front on photo with the destination of City and a "Pay as You Enter". The Dickins sign can be seen. .5 - as for .2, No. 35 leads the queue. Has the Woolworths Big W store in the background. .6 - view from the rear (12, 30, 17) with No. 33 being driven out of the loop. .7 - View from the rear, 33 has moved out of view. Has the T&G (Temperance and General) building in the view. .8 - No. 31 moves over the points at the west end of the loop. The tram has the Destination of Gardens via Drummond North, a Twin Lakes advert and a SEC Electric Cooking Advert.trams, tramways, city loop, sturt st, trackwork, overhead, tram 33, tram 17, tram 26, tram 12, tram 35, tram 31 -
Ballarat Tramway Museum
Photograph - Digital image, Peter Waugh, 20/01/2013 12:00:00 AM
Digital image of Tram 671 and the Bedford tower truck on the depot fan in January 2013. The tram was being used to tow lengths of track prior to the relaying of the access track. The tower truck is parked on the grass, facing away from the camera.trams, tramways, tower wagon, trackwork, btm, tram 671 -
Ballarat Tramway Museum
Negative, Wal Jack, early 1950's
Yields information about the reconstruction of the curve on the Mt Pleasant line at Stones Corner.Negative and Digital images of the Wal Jack Ballarat Negative file of the relay of the outer rail at Stones Corner on the Mt Pleasant line. Shows removed rails and methodology of the work. Photo taken at 1220 as shown on the clock - all workers at lunch. In the view are the Listers COR service station, the Inspector chatting with a person, the Ballarat East Post Office and the Stones retail store. The first welding truck (cloth covered roof) with a wandering lead device. See Reg Item 7740 for a photo of similar work at Main and Barkly St.trams, tramways, stones corner, trackwork, track repairs, main road, victoria st, mt pleasant, inspectors, welding -
Ballarat Tramway Museum
Administrative record - Memorandum, State Electricity Commission of Victoria (SECV), "Tramway - Tracks", 8/11/1962 12:00:00 AM
Yields information about the work done in case of a public inquiry, in this case a report on Bendigo trackwork., Yields information about the work done in case of a public inquiry, in this case a report on Bendigo trackwork.Memorandum, typed onto a light green sheet with rounded corners, dated 8/11/1962, titled "Tramway - Tracks" enclosing copies of notes regarding a recent track inspection of Bendigo in preparation for a possible Public Inquiry. trams, tramways, track, track repairs, bendigo -
Ballarat Tramway Museum
Administrative record - Memorandum, State Electricity Commission of Victoria (SEC) and The Courier Ballarat, cuttings from The Courier re possible closure, May. 1962
Yields information about the method of advising SEC Management of letters to the Editor concerning the possible closure of the SEC Ballarat system., Yields information about the method of advising SEC Management of letters to the Editor concerning the possible closure of the SEC Ballarat system.Set of three memorandums to the Engineer & Manager from the Ballarat Manager, on green paper - all with rounded corners. 1 - enclosing cuttings from The Courier, 23/4/1962 re the AETA visit and a note re a photo (dated 27/4/62) 2 - ditto cuttings for 13/4 and 19/4 (dated 19/4/1962) 4 - memo enclosing cuttings of 13/4, 16/4, 17/4 and 18/4 (dated 18/4/1962) See Reg Item 7910 for these items. trams, tramways, closure, letter to the editor, editorial, aeta, trackwork, lunch hour -
Ballarat Tramway Museum
Newspaper, "Tram track to be relaid", 21/08/2019 12:00:00 AM
Newspaper cutting from The Courier, Ballarat, 21 August 2019 titled "Tram track to be relaid" written by Jolyon Attwooll reporting on the planned replacement of the track between Depot Junction and Carlton St by Fulton Hogan, supported by a State Government Pick My Project grant and the City of Ballarat. Quotes Peter Waugh.btm, trackwork, track repairs -
Ballarat Tramway Museum
Photograph - Digital image Set of 28, Mal Rowe, 21/09/2019 12:00:00 AM
Set of 28 digital images of the 2019 Tramcar Showcase by Mal Rowe on 21/9/2019. .1 - View looking south from depot junction showing the track replacement pending the final asphalt layer. .2 - looking north towards depot junction .3 - 27 crossing Wendouree Parade .4 - 14 crossing with John Phillips ex MMTB Mk III Bus in the background. .5 - 13on the access track. .6 - 8 on the depot fan .7 - Cavalcade line up lead by 26 .8 - ditto .9 - group photo being arranged .10 - Cavalcade line up lead by 26 .11 - ditto .12 - 28 returning to the depot. .13 - ditto .14 - 27 returning to the depot on the access track. .15 - 18 ditto .16 - 18 ditto .17 - 13 ditto .18 - 13 ditto .19 - 18 ditto .20 - 40 running in with Mk III bus in the background .21 - 40 on the access track .22 - ditto .23 - 38 on the access track .24 - close up of the 22E truck .25 - depot fan in general. .26 - 14 on the access track .27 - 38 on the access track .28 - 38 dittotrams, tramways, btm, tramcar showcase, events, cavalcade, wendouree parade, trackwork, buses, 22e trucks, depot, tram 13, tram 38, tram 26, tram 14, tram 8, tram 27, tram 14, tram 28, tram 18, tram 27, tram 38, tram 40, tram 671 -
Ballarat Tramway Museum
Photograph - Digital image, Wal Jack, 21/10/1951 12:00:00 AM
Yields information about the early use of Ballarat's bogie trams and the curve from Main Rd into Barkly St on the Mt Pleasant route following track work.Digital image from the Wal Jack Ballarat Album of Ballarat 35 turning into Barkly St Mount Pleasant route from Main Road, 21-10-1951, Wal notes say testing new outside curve following renewal. Wal gives time as 3pm Sunday. Note the hotel behind the tram, rare to see this in a photograph and the young lady with a large pram. See image i2 for rear of photograph. See image i3 for hi res scan of print. See image i4 for hi res scan of negative See Reg Item 7740 for a photograph of the work.On rear in ink "SEC Ballarat No. 35 as special testing new outside curve (96lb rails), Main Rd into Barkly St, Ballarat East, Sunday 3pm 21st October 1951" In top right hand corner is Wal Jack stamp with negative number "T24/PC" written in.trams, tramways, mt pleasant, barkly st, main road, trackwork, tram 35 -
Ballarat Tramway Museum
Book, Dipl-Ing Gunter Claus and Krupp Stahl AG, "Structures of Permanent Way for Rail Bound Traffic", 1981
Book - Foolscap size, approx. 100 pages, duplicated and bound into grey card folders, stapled and binding tape on the left hand side, titled "Structures of Permanent Way for Rail Bound Traffic", published by Krupp - Stahl AG 1981. Published by the University of Alberta, Edmonton, Alberta Canada. Written by Dipl-Ing Gunter Claus, shop manager, Krupp Stahl AG Switch department. Has an index, many drawings, photographs, types of track structures, rails, turnouts, points, geometry.trams, tramways, trackwork, points, tramways, rails -
Ballarat Tramway Museum
Newspaper, The Courier Ballarat, "Everything back on smooth track", 25/07/2002 12:00:00 AM
Yields information about track repairs by the BTM in Wendouree Parade and has a strong association with Alan Snowball.Newspaper clipping from the Courier, Thursday 25 July 2002, titled "Everything back on smooth track" about track repairs by the BTM the previous day, near the playground. Features a photo of Alan Snowball working on the track. Photo by Jeremy Bannister.Item has the date, source and page written in ink.btm, trackwork, maintenance, wendouree parade -
Ballarat Tramway Museum
Photograph - Colour Print, Lilian Butler, Sep. 1971
Possibly has a strong association with the tram track and depot maintenance staff at the time of closure of the SEC operated Ballarat system.Colour print of a group of four SEC workers standing alongside the cloth covered SEC Ballarat Tramway track gang truck, in Lydiard St North, with the railway gates in the background. The man on the right hand side is holding a rolled up green flag. These workers were not included in the staff photo. Refer to track diaries in the collection for possible names. Item was placed in an envelope marked "Mr. Vermeend" - retained with photograph in storage folder. Photo printed on Kodak Paper. Photograph by Lilian Butler?in ink on rear " Lydiard St Nth Ballarat. With my compliments Lilian Butler"trams, tramways, sec, depot, trackwork, track, personnel -
Ballarat Tramway Museum
Document - Press Release, Sarah Henderson and Paul Mong, "Morrison Government's funding boost for Ballarat's historic tramway", 21/12/2021 12:00:00 AM
Press Release within an email dated 21/12/2021, titled "Morrison Government's funding boost for Ballarat's historic tramway", advising of $1.2m funding for the balance of the reconstruction of the Wendouree Parade track and other road projects for the City of Ballarat. Gives details of the BTM and its volunteers. Released by Sarah Henderson, Senator for Victoria.trams, tramways, btm, trackwork, reconstruction, grants -
Ballarat Tramway Museum
Newspaper, The Courier Ballarat, "Rail Lines link with Old Phoenix Foundry", 1950
Yields information about the Phoenix foundry and tramway crossing in Sturt St in 1950.Newspaper Clipping from The Courier, 12/2/1950 titled "Rail Lines link with Old Phoenix Foundry", about the uncovering of the rails left in Sturt St at Armstrong St, part of the former Phoenix Foundry line - uncovered during rail replacement activities. Has a photograph showing the two exposed ends of workers replacing the rail line and gauging the track. Gives a short history of the Phoenix Foundry. Contained within Reg Item 5507 - Foolscap binder with green covers, black binding edge and metal clips. sturt st, trackwork, phoenix foundry -
Ballarat Tramway Museum
Document - Report, State Electricity Commission of Victoria (SECV), "Tramways - Ballarat / Bendigo Abandonment", 12/02/1962 12:00:00 AM
Yields information about costing by the SEC to upgrade the tram tracks and trams in both Ballarat and Bendigo and the basis.Copy of a report sent by the Melbourne office, Engineer and Manager SEC to the Manager Ballarat Branch, 12/2/1962, titled "Tramways - Ballarat / Bendigo Abandonment". Notes the 1934-37 rehabilitation was palliative in nature, and now must be "in to stay" or "eliminated". Melbourne costs given, the cheapest form adopted, Ballarat cost about 1million pounds and Bendigo 600,000. New cars imported about 20,000 each. Total cost based on 40 cars, about 2.5m pounds. Refers to Mr. Kirby of the MMTB, but would need official figures from Mr. Risson.trams, tramways, sale of trams, sec, closure, new trams, trackwork, reconstruction -
Ballarat Tramway Museum
Photograph - Digital image Set of 2, Warren Doubleday, 5/01/1974 12:00:00 AM
Set of 2 digital images of: .1 - Track construction of No. 2 road at the BTPS Depot, 5-1-1974 - Gavin Young, Richard Gilbert (sitting), Geoff Cargeeg, Tony Smith and Barry McCandlish. .3 - dittotrams, tramways, btps, depot, trackwork, tram 27 -
Ballarat Tramway Museum
Photograph - Digital image Set of 3, Warren Doubleday, 1/01/1973 12:00:00 AM
Set of 3 digital images of: .1 - No. 27 at the end of the track so far constructed probably 1-1-1973 .2 and .3 - No. 26 and 27 out on No. 2 road, during a New Year construction push.trams, tramways, btps, depot, trackwork, tram 27 -
Ballarat Tramway Museum
Document - Report, State Electricity Commission of Victoria (SECV), "Annual Report - Bendigo Tramways", c1940
Demonstrates documentation and methods used to prepare annual reports for each SEC tram system.Report - 9 sheets, (8 foolscap), titled "Annual Report - Bendigo Tramways", dated 30/6/1956. Memo dated 31/10/1956 to the Ballarat office. Report signed by J H Sutherland. Report comprises information on Rolling stock, and Tram depot Maintenance, painting, spare parts ex Geelong, tram track maintenance including personnel numbers, overhauls, traffic, personnel, accidents, injuries and lost property. A separate report is provided for overhead. trams, tramways, bendigo, annual reports, rolling stock, traffic staff, trackwork, personnel, accidents, overhead, tramcars, maintenance -
Ballarat Tramway Museum
Negative - Set of 4, Warren Doubleday, May or June 1972
Black and white negative - 4 scanned images - of the laying of the first track inside the BTPS depot - placing sleepers and rail on No. 3 road. May or June 1972,trams, tramways, btps, trackwork, depot -
Ballarat Tramway Museum
Newspaper, The Courier Ballarat, "Rates Renewal", 27/05/2014 12:00:00 AM
Newspaper clipping from The Courier, Friday 27/5/2014, pages 1, 4 and 5 about the renewal of City of Ballarat Infrastructure and the Council rates proposals. Included $100,000 for renewal of tram tracks. Includes a photograph of the horse tram in Wendouree Parade on page 1btm, museum, city of ballarat, wendouree parade, trackwork -
Ballarat Tramway Museum
Negative - Set of 3, Campbell Duncan, 26/12/1971 12:00:00 AM
Selected negative from a group of about 22 negatives showing the activities at the BTPS. Set of three photos taken on 26-12-1971 or the dismantling "0" road at the SEC depot. SEC depot Tennis court fence on right hand side and tram 14 being pushed back into the depot. Photographed by Campbell Duncan or Paul Nicholson. See also Reg Item 3545 a similar photograph by Paul Nicholson.trams, tramways, btps, trackwork, sec depot, tram 14 -
Ballarat Tramway Museum
Document - Report, Melbourne and Metropolitan Tramways Board (MMTB), "Report and Statement of Accounts" for year ended 30 June 1964, 1964
Annual report of the MMTB for the year end 30/6/1964 - No. 45 - buff heavy paper cover with 48 pages on inside giving details of the MMTB Board, Officers, Balance Sheet, Statement of funds, operation, schedule of debenture, investments, Auditors reports, record of Annual traffic receipts, passengers, miles etc, tram and bus routes operated, statistical information, graphs and photographs. Photos include trams operating in Stuttgart, Dusseldorf, Frankfurt-on-Main, window display Victoria House London, overseas recruiting, test equipment in a W class tram, building construction, Doncaster.trams, tramways, mmtb, melbourne, annual reports, operations, trackwork -
Melbourne Tram Museum
Pamphlet - Tram Service Change - Route 55, Public Transport Victoria (PTV), 11/2013
Issued for track work in Kingsway and Park St South Melbourne, route 55, undertaken between 30/11/2013 and 1/12/2013. Has a map showing the work zone, mainly in Park St and buses between the city and Domain Interchange and tram service changes. Produced by Yarra Trams and the PTV.Yields information about track work in Park St South Melbourne during 2013.Pamphlet - full colour DL two fold, printed on light card.trackwork, park st, route 55, kingsway -
Melbourne Tram Museum
Document - Project Notice, Yarra Trams, "Collins St and Spencer St junction renewal works", June 2023
Project notice for - "Collins St and Spencer St junction renewal works" - Gives details of alternative arrangements, walking around the works, tram service changes, maps and timing for the works. Work scheduled 30/6/2023 to 9/7/2023. The last time that the junction was relaid was during 2011.Yields information about the renewal of the Collins St and Spencer St junction track work.Notice - 3 A4 page document - pdf version downloaded and printed version.tramways, public transport, collins st, spencer st, trackwork -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "Route 1 and 6 Buses replace trams", Feb. 2019
Issued for track work in Holmes Road and Nicholson St Brunswick between 23 Feb. and 7 March 2019 impacting routes 1 and 6. Produced by Yarra Trams and the PTV.Yields information about track work in Holmes Rd and Nicholson St Brunswick 2019.Pamphlet - full colour DL 6 fold.trackwork, tramways, nicholson st, holmes road, brunswick, route 1, route 6 -
Melbourne Tram Museum
Pamphlet - Metro Tunnel - Anzac Station tram corridor works, Rail Projects Victoria, 11/2022
Provides information about the works planned to realign tram tracks at the Metro Tunnel Anzac station, following the completion of the surface works. Gives timing, tram routes affected, plans of the proposals, contact details. All St Kilda Road routes would be affected from 27/11/2022 to 17/12/2022, tram stops would be closed, bus replacement services. includes works to remove the Glenhuntly Road level crossing at Glenhuntly Station. Yields information about the trackworks for the future Anzac Station interchange and St Kilda Road services.Set of two documents issued by Rail Projects Victoria (Metro Tunnel) and Yarra Trams with regard to the reallignment of tram tracks at Anzac Station Nov. 2022 1 - Metro Tunnel - Works proposed, maps - 6 A4 pages 2 - Yarra Trams - Service Changes St Kilda Road works - 4 A4 pages.anzac station, metro tunnel, tramways, st kilda road, domain road, domain interchange, park street, track work, tram tracks, glenhuntly road, glenhuntly station, level crossings -
Melbourne Tram Museum
Poster, Tram Service Changes, March 2022
Poster advising passengers in trams of the planned service changes for April, June and July 2022. Includes the Grand Prix, public holidays, Malvern Road, Glenferrie Road track renewals and Glenhuntly level crossing removal.Demonstrates the methods that Yarra Trams use to advise passengers of service changes.A3 size colour poster regarding tram service changes. Two plastic covers that contain the posters in the rack included in the A3 folder.posters, tramways, trackwork, passengers, tramcars, glenhuntly station, grand prix