Showing 262 items
matching train engine
-
Wodonga & District Historical Society Inc
Photograph - Fred Rochow Railways Collection - Receiving Silver Trays at Bendigo, 21 November 1985
The Fred Rochow Railways Collection incorporates photos related to the operation of the Wodonga Railway Station including different types of trains and railways staff C. 1930 – 1990. It was donated to the Wodonga Historical Society by Fred Rochow, a railwayman who spent many years based in Wodonga. He joined the Victorian Railways on 17th June l947 and retired in 1988. For some time, he was a member of the Australian Federated Union of Locomotive Enginemen and served a term as a member of the Trades Hall Council. He had an extensive knowledge of the struggles that took place to achieve better conditions for railway workers. Fred worked for many years as a fireman and then worked his way up the ranks to driver, experiencing many changes from the days of steam locomotives through to diesel trains, locomotives and even the modern XPT train. He worked throughout Victoria at different stages of his career, with his final working years focused on the northeast of Victoria and the Albury to Melbourne line. After his retirement, Fred continued to share his love of steam miniature trains with the community.This collection has local and statewide significance as it captures images of trains, locomotives and personnel who operated the railway services in Wodonga and throughout Northeast Victoria. The railways played a critical role in opening up Victoria and connecting Australia for trade, business, social communication and transport. Railwaymen at Recognition of service function in November 1985. Left to right: Len Gregson, Bill McAnanly, Eric Kaine (Benalla), Fred Rochow, Engine Inspector Geoff Williamsrailways wodonga, fred rochow, wodonga railwaymen, recognition of service -
Wodonga & District Historical Society Inc
Photograph - Wodonga old Railway Station complex, c1980s
\When the railway reached Wodonga from Melbourne on 19th November 1873 the first station building, which included a refreshment room and dining room, was a temporary structure. It was 300 ft. long and was removed and taken to Beechworth when the new station was built in 1874 by contractor J. Richardson. The Goods shed was 100 feet long and was built by Frew & Hill in 1873. One year later it was extended an additional 150 feet by James Nation. The date of the construction of the Locomotive shed is not known but predates 1883. It was a galvanised iron clad building which housed 4 engines on 2 tracks; in 1910 it was extended to 250 feet in length to house six more engines. The location of the railway tracks and station were a constant cause of congestion in the centre of Wodonga as the tracks crossed over Sydney Road (later named High Street). Lines of traffic were frequently banked up as the gates were closed to allow trains to cross. The Wodonga Rail Bypass project moved Wodonga station from the original central location to a position on a new line on the northern edge of the town. Not only did this release land in the middle of the city for commercial and public use, but also eliminated 10 level crossings. The project actually commenced in 2008 with the last passenger train passing through Wodonga on 8 November 2008. On 23 July 2010, the new rail bypass was opened, the original line through Wodonga closed and the station fell quiet. The area has now been redeveloped as Junction Place and the old buildings now house a restaurant, cafe and the Goods Shed Craft Beer Cafe.These images are of local, state and national significance as the Wodonga Railway complex formed a vital link in the Victorian state, interstate and national railway system.A collection of colour photos of the buildings at the former Wodonga Railway Stationwodonga railways, railway station wodonga, junction place wodonga -
Wodonga & District Historical Society Inc
Photograph - Falkiner Electric Road Train in front of George Leighton's Wodonga Store and Bakery Wodonga 1914
This image of the Ralph Falkiner’s Mueller Petrol-Electric Road Train was taken in Wodonga in February 1914. Imported from Germany by Mr Ralph S Falkiner in late 1913, the train’s inventor, Major W A Mueller with two assistants, came to Melbourne to assemble then commission the train. The train cost Mr Falkiner about £13,000 plus £4,591 import duties. The Falkiner family were sheep breeders in the Western Riverina and he hoped to use the road train primarily to convey wool to the railways for despatch to Sydney. The train was 216 feet long, weighed 43.5 tons with a top speed loaded of 6-8m/h and petrol consumption up to two gallons per mile. Its first Australian journey was to haul 50 tons of cargo to Edmondson & Co at Wagga Wagga, 277 miles away. The journey from Melbourne was plagued with problems including broken cylinders and crank shaft and overheating as it was not designed for Australian climatic conditions. Three months after leaving Melbourne it arrived in Wodonga. A series of problems between Springhurst and Wodonga, including broken cylinders and valves caused an eight day delay. Some of the cargo was off-loaded in Albury, then after repairs the train continued on to Wagga where it arrived in May 1914. After unloading there, the road train was taken to Mr Falkiner's Groongal Station, near Hay and subsequently made several long trips into drought-stricken areas or the Western Riverina. Eventually the dream collapsed when the engines gave out after the train bogged in the sticky black soil of the Hay plain with 251 bales of wool on board. The train was finally railed back to Melbourne and stored but destroyed when the warehouse burnt down. In this photo, the road train is drawn up outside the Wodonga Stores and Bakery owned and operated by George Leighton. Mr Leighton began his business opposite the Terminus Hotel in Sydney Street, Wodonga in 1885. His business included a general store, stocking groceries, ironmongery, drapery, crockeryware, boots and shoes as well as a bakery. He was very actively involved in the community and served on the Wodonga Council for 18 years including three terms as Wodonga Shire President in 1901 – 02, 1910-11 and 1913-14. He was also Chairman of the Wodonga Waterworks Trust for several terms. Mr. Leighton also took a prominent part in the movement to establish a Public Library in Wodonga. His other involvements including being a Founder of the Wodonga Lodge of Freemasons, Honorary Treasurer of the Wodonga Bulldogs Football Club and Secretary of the Wodonga Racing Club. Mr Leighton passed away in Wodonga in 1916.This image is significant because it records a rare event in Wodonga and an experiment in Australian road transport.Black and white images of the Falkiner Road Train in Wodonga and on its first journey from Melbourne to Wagga, NSW It is taken in front of the Wodonga Stores and Bakery operated by George Leighton in Sydney Street, Wodonga.falkiner electric train, early road transport, high street wodonga, george leighton -
Victorian Railway History Library
Book, Sargent, John, Photographer Profile Gerald Dee, 1998
A photographic profile from the Gerald Dee collection, former engine driver on the Victorian Railwaysill, p.56.non-fictionA photographic profile from the Gerald Dee collection, former engine driver on the Victorian Railwaysphotography - gerald dee, railroad operations - australia - history -
Victorian Railway History Library
Book, Sargent, John, Photographer Profile Jim Seletto, 1999
A photographic profile from the Jim Seletto collection, former engine driver on the Victorian Railwaysill, p.48.non-fictionA photographic profile from the Jim Seletto collection, former engine driver on the Victorian Railwaysrailroad operations - australia - history, photography - jim seletto -
Victorian Railway History Library
Book, David Burke, 30 Days On Australia's Railways - A diary of September journeys, 2014
An entertaining look at railway events in Australia in the month of September - from 1848, when a meeting was called to start a railway company in New South Wales, to 2013, when the great Bayer-Garrett AD6029 steam engine was restored to working order. For some strange reason, September has been a month when particularly memorable railway events tend to occur. Author David Burke has crafted a 'diary' which documents, day by day, major happenings to do with railways in Australia - from the days of steam, to diesel, to diesel-electric and electrification, covering the first trains that ran between New South Wales and Queensland, and to Melbourne. It was in also September that the first sod was dug for the Trans-Australian Railway across the Nullarbor to Perth. The book is heavily illustrated with historic photographs, both black and white and colour, newspaper cuttings, sketches and maps, and features 13 paintings by renowned railway artist Phil Belbin. Names that leap to the fore among those who made railway history happen include Ben Chifley, the locomotive driver who became Prime Minister of Australia, engineer Dr John Bradfield, designer of the Sydney Harbour Bridge and responsible for putting Sydney's city trains underground, James Fraser, first Australian-born Chief Commissioner for Railways, and Harold Young, the Scotsman who designed the C38 engine and the Silver City Comet. Cover picture shows: Climbing the steep Fassifern Grade with a heavy coal train maakes for plenty of Bayer-Garrett action in Phil Belbin's painting of the AD60 class at work on the Shorty North line to Newcastle New South Wales Australia.ill. p.172.non-fictionAn entertaining look at railway events in Australia in the month of September - from 1848, when a meeting was called to start a railway company in New South Wales, to 2013, when the great Bayer-Garrett AD6029 steam engine was restored to working order. For some strange reason, September has been a month when particularly memorable railway events tend to occur. Author David Burke has crafted a 'diary' which documents, day by day, major happenings to do with railways in Australia - from the days of steam, to diesel, to diesel-electric and electrification, covering the first trains that ran between New South Wales and Queensland, and to Melbourne. It was in also September that the first sod was dug for the Trans-Australian Railway across the Nullarbor to Perth. The book is heavily illustrated with historic photographs, both black and white and colour, newspaper cuttings, sketches and maps, and features 13 paintings by renowned railway artist Phil Belbin. Names that leap to the fore among those who made railway history happen include Ben Chifley, the locomotive driver who became Prime Minister of Australia, engineer Dr John Bradfield, designer of the Sydney Harbour Bridge and responsible for putting Sydney's city trains underground, James Fraser, first Australian-born Chief Commissioner for Railways, and Harold Young, the Scotsman who designed the C38 engine and the Silver City Comet. Cover picture shows: Climbing the steep Fassifern Grade with a heavy coal train maakes for plenty of Bayer-Garrett action in Phil Belbin's painting of the AD60 class at work on the Shorty North line to Newcastle New South Wales Australia.railroads -- australia -- history., railroad travel -- australia -- history. -
Victorian Railway History Library
Book, Daddow, Vivian, The Puffing Pioneers - and Queensland's Railway Builders, 1975
INTRODUCTION Until well into the twentieth century, driver, fireman and guard — with a locomotive — set out on something resembling a safari. Tucker boxes crammed with food, a change of clothing, a roll of blankets, and armed with a sheaf of time-tables, they worked trains hither and thither not to return home for almost a week. But the passing of time, plus union pressure, brought an end to the need for "waltzing Matilda". Not only blankets but sheets, pillow slips, then later mosquito nets, along with other aids to civilized living, were provided by the Department in living quarters away from home. Few wives took kindly to the chore of selecting and preparing food and packing tucker boxes. Railwaymen seeking board and lodgings in a new depot could receive a set-back by being told "no tucker boxes packed". Until pooling of locomotives in depots became the order, a driver and fireman had "their own engine", and great was the competition between engine crews to display the best groomed horse. Much time might be spent outside rostered working hours cleaning their engine with kerosene and polishing with tallow and bath brick. So spotless and sparkling were some that a proud engineman would say a clean white handkerchief could be rubbed even over a hidden part. While miners talked of what made their day, farmers discussed crops and harvests, seamen their ships, and trainers and jockeys their horses, wherever steam men gathered, discussion soon turned to locomotives and the trains they hauled. Like jockeys with their mounts, iron horses with excellent traits were praised while those with annoying peculiarities were criticized and remedies suggested. Methods of firing to get best results from slow steaming locos were debated. Driver warned driver of weaknesses found in locomotives on recent "trips", spoke of developing defects calling for close attention — this one is "knocking Badly on one side", that one "priming badly (give her a good blow down before leaving the shed)", another with a "big end inclined to run hot", one with "a lot of slop in the boxes", one "getting down on the springs", or the sloth that was slow pulling on steep climbs to the chagrin of a driver striving to run on time. Things of no small concern when handling a locomotive on a train for a shift of maybe eight hours straight, or ten, even twelve, and on occasions longer. Foreknowledge of the particular loco allotted his train on the next job could fill the preceding hours for a driver or fireman with pleasant contentment, or with nagging trepidation and disgust……index, ill, p.217.non-fictionINTRODUCTION Until well into the twentieth century, driver, fireman and guard — with a locomotive — set out on something resembling a safari. Tucker boxes crammed with food, a change of clothing, a roll of blankets, and armed with a sheaf of time-tables, they worked trains hither and thither not to return home for almost a week. But the passing of time, plus union pressure, brought an end to the need for "waltzing Matilda". Not only blankets but sheets, pillow slips, then later mosquito nets, along with other aids to civilized living, were provided by the Department in living quarters away from home. Few wives took kindly to the chore of selecting and preparing food and packing tucker boxes. Railwaymen seeking board and lodgings in a new depot could receive a set-back by being told "no tucker boxes packed". Until pooling of locomotives in depots became the order, a driver and fireman had "their own engine", and great was the competition between engine crews to display the best groomed horse. Much time might be spent outside rostered working hours cleaning their engine with kerosene and polishing with tallow and bath brick. So spotless and sparkling were some that a proud engineman would say a clean white handkerchief could be rubbed even over a hidden part. While miners talked of what made their day, farmers discussed crops and harvests, seamen their ships, and trainers and jockeys their horses, wherever steam men gathered, discussion soon turned to locomotives and the trains they hauled. Like jockeys with their mounts, iron horses with excellent traits were praised while those with annoying peculiarities were criticized and remedies suggested. Methods of firing to get best results from slow steaming locos were debated. Driver warned driver of weaknesses found in locomotives on recent "trips", spoke of developing defects calling for close attention — this one is "knocking Badly on one side", that one "priming badly (give her a good blow down before leaving the shed)", another with a "big end inclined to run hot", one with "a lot of slop in the boxes", one "getting down on the springs", or the sloth that was slow pulling on steep climbs to the chagrin of a driver striving to run on time. Things of no small concern when handling a locomotive on a train for a shift of maybe eight hours straight, or ten, even twelve, and on occasions longer. Foreknowledge of the particular loco allotted his train on the next job could fill the preceding hours for a driver or fireman with pleasant contentment, or with nagging trepidation and disgust…… railroads -- queensland -- history, railroads -- australia -- queensland -- history. -
Victorian Railway History Library
Book, Train Hobby Publications, Locomotive Profile Victorian Railways Narrow Gauge A class, 2000
A photographic profile of the NA 2-6-2 2'6" narrow gauge tank engines of the Victorian Railways in the early 1950s.Ill, p.48non-fictionA photographic profile of the NA 2-6-2 2'6" narrow gauge tank engines of the Victorian Railways in the early 1950s.steam locomotives - victoria- history, puffing billy - victoria - history -
Moorabbin Air Museum
Photograph (Item) - Taylor Monoplane design , Twin Wasp C3 engine, De Havilland story, Retirement activities, Industrial relations, tool design data Lidcombe, Kingsford Smith, Southern Cross, Flying Finns, benalla, Gliders, Maatsuyker, ICAO, Concorde noise level, Bristol Beaufighter Whispering death, Boeing CH-47C Chinook, Cessna A-37B Dragonfly, Jim Knight, Saab J29, Harvard MkIIA, Wackett trainer, Rocket powered interceptor, YF-23, Henty house, DCA day, Gabo Island, Fokker F28, Transport Australia magazines, P-39 Aircobra, Civil Aviation in Australia, Construction of Melbourne airport, Technology in Australia, Computers, John Cock, Navy today, Vickers Viscount, Bantam 820, Orville Wright first fight telegram, Qantas history, Australias Aircraft industry, Beaufighters, Mustangs, Lincolns, Beauforts, Tudors, Mosquitos, Boomerangs, Dragons, Wacketts, Tiger Moths, ME109, Australian aviation history
-
Buninyong Visitor Information Centre
Functional object - Nut, railway track, Part of a nut used on the Buninyong railway line engine
Reputed to have been from a train used on the Buninyong railway line. Circumstances of its finding are not recorded. Half a nut from a train used on the former Buninyong railway line. The inside edge is threaded.Nonerailways, buninyong, trains -
Melbourne Tram Museum
Album - Photographs - Comeng Dandenong, 1980s - 1990s
In March 2024, Milissa Box (DTP) was at a trash and treasure market. She'd found a $5 photo album for sale with some photos that she thought might be of interest… From what I can gather it belonged to the gentleman pictured who was a worker at Dandenong in the Comeng and ABB eras. He appears to have worked on the Z3, A1/A2, B1/B2 class trams, Hong Kong LRVs, Comeng Melbourne suburban trains, and later the extra Victorian-purchased XP power cars and XAM sleepers to enable the Riverina XPT to be extended to Melbourne. It's clear he was very proud of the vehicles he'd helped to build. I have scanned a selection of the images, which appear to be a mix of official builder's portraits, team photos, and self-taken shots showing candid everyday scenes on the shop floor. There are also images of the launch of the XP power cars with then-Victorian Premier Joan Kirner; and some personal visits to see the Flying Scotsman, Victorian Goldfields Railway, Coal Creek, etc. Filename Description Date Comeng Scans 2024-03-05 0001 Three Comeng workers (including the photographer) stand in front of Comeng suburban train 697M (Chopper unit) c. June-July 1989 Comeng Scans 2024-03-05 0002 Three Comeng workers (including the photographer) stand in front of Comeng suburban train 697M (Chopper unit) c. June-July 1989 Comeng Scans 2024-03-05 0003 Hong Kong Light Rail Phase 1 LRV 1013 being lifted onto its transport loader c. 1987-88 Comeng Scans 2024-03-05 0004 Walter Wright transport truck (Mack) waits to draw a heavy transport platform out of a shed at Comeng Dandenong. Hong Kong Phase I LRV (1024) can be seen inside the shed c. 1988 Comeng Scans 2024-03-05 0005 Hong Kong Light Rail Phase 1 LRV 1013 on its transport loader in a shed at Comeng Dandenong ready for transport c. 1988 Comeng Scans 2024-03-05 0006 Hong Kong Light Rail Phase 1 LRV 1013 on its transport loader in a shed at Comeng Dandenong ready for transport c. 1988 Comeng Scans 2024-03-05 0007 The photographer is pictured fitting components to the cab of a Phase I Hong Kong LRV No 1026 c. 1988 Comeng Scans 2024-03-05 0008 Hong Kong Light Rail Phase 1 LRV 1013 on its transport loader at Comeng Dandenong ready for transport c. 1988 Comeng Scans 2024-03-05 0009 Hong Kong Light Rail Phase 1 LRV 1013 on its transport loader at Comeng Dandenong ready for transport c. 1988 Comeng Scans 2024-03-05 0010 Hong Kong Light Rail Phase 1 LRV 1013 on its transport loader at Comeng Dandenong ready for transport c. 1988 Comeng Scans 2024-03-05 0011 The photographer and a colleague are pictured in the car park posing for a photo at Comeng Dandenong c. 1988 Comeng Scans 2024-03-05 0012 The photographer and a colleague are pictured inside the cab of Comeng suburban train 697M, posing for a photo at Comeng Dandenong c. 1989 Comeng Scans 2024-03-05 0013 A stainless steel Hitachi train bodyshell is being transported on a truck-trailer. Possibly taken at Martin and King in Bayswater, under transport to the station for railing to Somerton for fitout. This is a later series M car with the rear-mounted pantograph (note the mounting lugs above the non-driving end) c. 1980 Comeng Scans 2024-03-05 0014 A shot at Comeng Dandenong of the onsite workforce standing in front of a Phase I Hong Kong LRV. c.1987-88 Comeng Scans 2024-03-05 0015 A shot at Comeng Dandenong of the onsite workforce standing in front of a Phase I Hong Kong LRV. c.1987-88 Comeng Scans 2024-03-05 0016 Hong Kong Light Rail Phase 1 LRV 1038 on its transport loader at Port of Melbourne ready for transport c. 1988 Comeng Scans 2024-03-05 0017 Three Comeng workers (including the photographer) stand in front of a workbench at Comeng Dandenong c. June-July 1989 Comeng Scans 2024-03-05 0018 A newly completed Comeng train (wearing VicRail teacup orange) on the factory access track at Comeng Dandenong c. 1981 Comeng Scans 2024-03-05 0019 A newly completed Z3 class tram on a transporter, with its bogie frames waiting transport to Preston Workshops for final fitout and commissioning c. 1981 Comeng Scans 2024-03-05 0020 A newly completed Comeng train (wearing VicRail teacup orange) on the factory access track at Comeng Dandenong c. 1981 Comeng Scans 2024-03-05 0021 A newly completed Z3 class tram on a transporter, with its bogie frames waiting transport to Preston Workshops for final fitout and commissioning c. 1981 Comeng Scans 2024-03-05 0022 A Comeng/ABB artist impression presumably part of their bid for the Double Decker demonstrator train for Melbourne. Note the similarity to similar Comeng sets constructed for Sydney. c. Nov 1989 – April 1990 Comeng Scans 2024-03-05 0023 Victorian Railways steam locomotive K 169 on static display at Coal Creek. c. 1980s Comeng Scans 2024-03-05 0024 Comeng suburban train carriage 1190T on a traverser in the yard at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0025 Comeng suburban train carriages the yard at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0026 Comeng suburban train carriages the yard at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0027 Comeng suburban train carriages the yard at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0028 Comeng suburban train carriages the yard at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0029 Comeng suburban train in a shed at Comeng Dandenong. c. June-July 1989 Comeng Scans 2024-03-05 0030 Comeng suburban train carriage 1190T on a traverser in the yard at Comeng Dandenong – possible Factory Acceptance Inspection by the Met c. June-July 1989 Comeng Scans 2024-03-05 0031 Comeng suburban train carriage 1190T being tractor-shunted in the yard at Comeng Dandenong – possible Factory Acceptance Inspection by the Met c. June-July 1989 Comeng Scans 2024-03-05 0032 Two Comeng workers carry a train part (possibly a first aid kit) for fitting to a Comeng suburban train. c. June-July 1989 Comeng Scans 2024-03-05 0033 Comeng suburban train carriage 1190T on a traverser in the yard at Comeng Dandenong – possible Factory Acceptance Inspection by the Met. One of the Met staff appears to be giving one of the Comeng workers a kiss on the cheek. c. June-July 1989 Comeng Scans 2024-03-05 0034 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops; while what appears to be a classic AP6 Valiant Safari Wagon is in the foreground. c. June-July 1989 Comeng Scans 2024-03-05 0035 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops; while a worker poses for a photo with his hand on the rigging. c. June-July 1989 Comeng Scans 2024-03-05 0036 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops; An HT Holden Belmont sedan has been posed in front to appear as if it is towing the heavy vehicle. c. June-July 1989 Comeng Scans 2024-03-05 0037 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops; An HT Holden Belmont sedan has been posed in front to appear as if it is towing the heavy vehicle. c. June-July 1989 Comeng Scans 2024-03-05 0038 A1 Class tram 232 is pictured up on stands while various A/B class tram cab frames are in the foreground in various stages of assembly. Of note, 232 appears to have been returned to Dandenong for major repair or other work, and shows signs of having been in traffic for some time (weathering and wear) c. June-July 1989 Comeng Scans 2024-03-05 0039 various A/B class tram cab frames are in the foreground in various stages of assembly. c. June-July 1989 Comeng Scans 2024-03-05 0040 A group of Comeng Dandenong workers stopped on a tea break. c. June-July 1989 Comeng Scans 2024-03-05 0041 An A/B Class tram cab being fitted out with electronics and controls. c. June-July 1989 Comeng Scans 2024-03-05 0042 A new Comeng suburban train in Metropolitan Transit livery on the test track at Comeng Dandenong. c. mid 1980s Comeng Scans 2024-03-05 0043 A new Comeng suburban train in Metropolitan Transit livery on the test track at Comeng Dandenong. c. mid 1980s Comeng Scans 2024-03-05 0044 Interior shot of a new Comeng suburban train at Comeng Dandenong. c. mid 1980s Comeng Scans 2024-03-05 0045 Interior shot of a new Comeng suburban train at Comeng Dandenong. c. mid 1980s Comeng Scans 2024-03-05 0046 The exterior sign at Dandenong showing ABB brand. Early 1990s Comeng Scans 2024-03-05 0047 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops. Early 1990s Comeng Scans 2024-03-05 0048 The Brush generator and Paxman Valenta engine as fitted inside a new XP power car for NSW Countrylink (paid for by Victoria) c. 1992 Comeng Scans 2024-03-05 0049 An exterior shot of a new Countrylink XP power car for NSW under construction (paid for by Victoria) c. 1992 Comeng Scans 2024-03-05 0050 Two new XAM class XPT sleeper carriages under construction at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0051 A B2 class tram under construction at Comeng Dandenong Early 1990s Comeng Scans 2024-03-05 0052 A B2 class tram under construction at Comeng Dandenong Early 1990s Comeng Scans 2024-03-05 0053 An exterior shot of a new Countrylink XP power car for NSW being moved out of the shed c. 1992 Comeng Scans 2024-03-05 0054 An exterior shot of a new Countrylink XP power car at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0055 An exterior shot of a new Countrylink XP power car at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0056 An exterior shot of a new Countrylink XP power car at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0057 B2 class trams under construction at Comeng Dandenong Early 1990s Comeng Scans 2024-03-05 0058 An XP Powercar from NSW wearing the Intercity XPT Candy Livery at Comeng Dandenong. It is not known if this was originally painted in this livery (incorrectly) or if this was one of the first delivered series transported to Dandenong to aid the construction process of the four additional locomotives. Early 1990s Comeng Scans 2024-03-05 0059 Melbourne B2 Class tram B2.2100 (renumbered from 2102) painted in the distinctive Chocolate and Cream livery to mark the completion of 100 B2 class trams Early 1990s Comeng Scans 2024-03-05 0060 A factory forklift wearing a hand painted “We love Labo(u)r” cardboard sign, possibly in connection to a media event with the Victorian Premier onsite at Comeng Dandenong. c. 1992 Comeng Scans 2024-03-05 0061 An exterior shot of a new Countrylink XP power car at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0062 Two new new Countrylink XP power cars under construction and final fitout at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0063 An exterior shot of a new Countrylink XP power car on the traverser at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0064 A B2 Class tram is on a low-loader multiwheel transport trailer waiting transport to Preston Workshops. A large banner is draped on the side explaining that this is the 106th vehicle delivered to the Public Transport Corporation (B2.2108). c. Oct 1992 (based on delivery date) Comeng Scans 2024-03-05 0065 Victorian Premier Joan Kirner addresses a group of dignitaries in front of an ABB banner inside the main administration building at Dandenong, on the occasion of the first XPT power car purchased by Victoria being unveiled at a media event c. 1992 Comeng Scans 2024-03-05 0066 An ABB executive addresses a group of dignitaries in front of an ABB banner inside the main administration building at Dandenong, on the occasion of the first XPT power car purchased by Victoria being unveiled at a media event c. 1992 Comeng Scans 2024-03-05 0067 Victorian Premier Joan Kirner addresses the media in front of a completed XP class XPT power car at Dandenong, on the occasion of the first XPT power car purchased by Victoria being unveiled at a media event c. 1992 Comeng Scans 2024-03-05 0068 An exterior shot of a new Countrylink XP power car at Comeng Dandenong c. 1992 Comeng Scans 2024-03-05 0069 A Melbourne B2 class tram undergoing testing on the test circuit at ABB Dandenong c. early 1990s Comeng Scans 2024-03-05 0070 An XPlorer type DMU emerges from a shed at ABB Dandenong c.1994 Comeng Scans 2024-03-05 0071 Voith final drive axle mounted units for XPlorer railcars waiting to be fitted at Dandenong. c.1994 Comeng Scans 2024-03-05 0072 A completed XAM class sleeper carriage at ABB Dandenong. c.1993 Comeng Scans 2024-03-05 0073 Completed XPlorer railcars wait transfer to South Dynon for bogie exchange and transfer to NSW at ABB Dandenong. c. 1994 Comeng Scans 2024-03-05 0074 A clipping from an ABB internal newsletter outlining the staff-led initiative to commemorate the 100th B2 class tram with a special livery c.1992 Has photographs of ABB, Steamrail tours, Castlemaine and Maldon Railway, Fying Scotsman 4472 visit and Puffing Billy.Yields information about the people and events at Commonwealth Engineering plant Dandenong and the activities of the unknown compiler.Album containing 40 leaves, photos in a heavy card 3 ring spring binder.comeng, commonwealth engineering co., tramcars, hong kong, nsw, sydney, melbourne, railways, the met, b class, cmr, steam engines, abb, asea brown boveri -
Melbourne Tram Museum
Magazine, Metropolitan Transit Authority (MTA), "Met Lines", September 1984 to June 1985
Magazine, published by the Metropolitan Transit Authority of Victoria "Met Lines" (Metlines) - A3 when folded, printed on white gloss paper, with the MTA logo or symbol. Issued under the name of L. A. Strouse as Chairman. Continues from Reg Item 1040 - "Headway News" Major tram and bus items listed. Tramway and bus names only listed, not railway. .1 - Vol 1 No. 1 - September 1984 - 8 pages - 130 years of rail service. Has note about former name, station revitalisation, Met Miles achieved, travel club, Centre page spread of photos of Preston workshop activities, names in Key Associations, repainting of Scrubber 8W, 8, 745, Vic Tramways Bowls Association, Alan Edwards retirement, item on Hawthorn Clothing Workshop (with photo), Munitions bus 301 - Geoff Foster, John Weighman and Daryl Mead and sporting news, - Preston Workshops Soccer team. .2 - Vol 1 No. 2 - 8 pages - Christmas Issue 1984 - Intermodal - Box Hill, Royal Show, A class tram introduced - Driver Don Everard, new tourist guide, Neighbourhood bus revamp in Ringwood, Westona station, Bundoora extension, Transit brass band, Beppie Hedditch - Occupational Welfare Service at Hawthorn, B class trams, sporting news and restored Tacit train. .3 - Vol 1 No. 3, March 1985 - 8 pages - introduction of AVM, bus driver Geoff Neicno, Communications Technician Bruce Smith with MTA Posters or advertisements, Bundoora extension opened, exporting tramway expertise, bus neighboured planning, English on the Job, Met card travel competition, 130 new B class trams and auction sale of Tait Trains. .4 - Vol 1 No. 4 June 1985 - 8 pages - Flagstaff opened, Men at Work band, investigation Officers, library moves to Queen St, first annual report, families on the job - Kimber, Sutton and Luciews, AVM at Nicholson St Engine house. The magazine continues to an A4 version ,see Reg item 1059 and onwards.trams, tramways, mta, preston workshops, hawthorn, buses, sports, box hill, a class, tramway band, welfare, b class, posters, advertisements, metcard, competition, new trams, flagstaff station, nicholson st, tram 8, tram 745, tram 8w -
Bendigo Historical Society Inc.
Photograph - RAILWAYS COLLECTION: OF STEAM ENGINE D3 616
Railways Collection -Two Photos on glossy paper of Steam engine D3 616 with man's face superimposed in the clouds (in the colour photo) above the goods train bottom photo. The pages contain two photos of the same train - one in black and white, the other in colour - There is a pencil note on the back of one -David Bennett , - VR Steam Locomotive: D3 616 Moama N.S.W. Circa 1956 .Echuca Crew - Driver is Keith Bennett , Fireman is David Bernoth, Photographer is David Bernoth. The train is pulling goods wagons.bendigo, railways, david bernoth collection -
Moorabbin Air Museum
Manual (item) - (SP) AAP 7212.003-2 CAC maintenance manual Winjeel Pratt Whitney Wasp Junior R985 DI (AF) radial engine trainer Hamilton standard propeller constant speed
... Pratt Whitney Wasp Junior R985 DI (AF) radial engine trainer ... -
Moorabbin Air Museum
Manual - Aermacchi MB326 Trainer, Aermacchi MB326-H Ground Staff Familiarization Course Engine Course
... on engine maintenance for Macchi trainer, circa 1969 Duplicate item ...Technical guide for training on engine maintenance for Macchi trainer, circa 1969Duplicate itemnon-fictionTechnical guide for training on engine maintenance for Macchi trainer, circa 1969 -
Ringwood and District Historical Society
Photograph, Train derailment at Wantirna Road subway in Ringwood, looking towards station. Station St. on right. 1/2/1902
Black and white photographs - 2 copiesVarious accompanying inscription beneath and on back of photographs. They read as follows: "Train derailment at Wantirna Road subway looking towards station. Station St. on right. 1/2/1902. This date has been written as 1908 on other locations in other places. Area behind engine was later railway car park." "Ringwood derailment 1902 (copied from magazine Latrobe library [ARHS Vic. Div. photo collection #748-1]. Cross at lower right marks spot from where fireman McKeone was rescued. Wantirna Rd. underpass. Station to left". -
Linton and District Historical Society Inc
Postcard - Photograph, Steam Train, Linton Railway Station
Postcard which has a black and white image of a steam engine and carriages at Linton Railway Station. The R class engine was constructed at the Phoenix Foundry, Ballarat, between 1881 and 1886.Text, reverse: "Boy sitting on engine is Harold Morgan, man wearing bowler hat standing beside engine thought to be Mr Bourke, engine driver, father of Kitty and Lizzie. White house behind station master's cap, weatherboard cottage occupied by Mrs Howe, her daughter Myra and son Billy. Man on station wearing cap thought to be station master, Alec Thompson's father".linton railway station, steam engines, transport, railways -
Ringwood and District Historical Society
Photograph, Boiler explosion at Ringwood station 20th June 1894 for engine 297R. "Heard in Box Hill"
... train. Witness had a look at the engine and found the dome... train. Witness had a look at the engine and found the dome ...Black and white photographs - 2 copiesTyped below photograph, "Boiler explosion at Ringwood station 20/6/1894. Heard in Box Hill". Article from newspapers:- Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 21 Official enquiry. The Board of Enquiry appointed by the Railway Commissioners to enquire into the causes of the boiler explosion which shattered the locomotive at Ringwood on Saturday night, assembled at the Railway department on Wednesday to commence its deliberations, The board consisted of Mr R. Fulton, engineer, C. W. McLean; engineer to the Marine Board, and Mr Mephan Ferguson, iron-founder. There is some difficulty at the outset about the constitution of the board; It was suggested that the Apt of Parliament contemplated that boards of experts, after the manner of the present one, needed, to have their appointments confirmed by the Governor-in-Council. The point, however, was not considered sufficiently important to prevent the board from proceeding with evidence. Robert Greyford, stationmaster at Ringwood, was the first witness. He said he saw the explosion on Saturday night at about twenty minutes to 8. There was a rush to the engine to see what had happened, and the driver and fireman were both found on the platform of the engine. The driver seemed badly hurt, but the fireman, to all appearances, was not so badly injured. They were both attended to and sent up to Melbourne by the last suburban train. Witness had a look at the engine and found the dome and all the plates round the boiler blown clean, away. The springs were also blown clean away. The Chairman (Mr Fulton) : Did you measure the distance ? Witness: Yes; one of the plates was 209 yards away. A piece from the top of the boiler 15 pounds in weight he found driven into the hard beaten track 410 yards away. Several pieces of boiler plate were found scattered at various distances. The buildings roundabout were injured. The Chairman; Did you notice anything peculiar about either of the driver or the fireman ? — No ; nothing wrong, with either of them. If the engine was blowing off at all, it must have been very light. In your opinion, were they perfectly sober ? — Perfectly. In approaching the station, is there a down or an up grade? — A very slight down grade. How is the road from Healesville ? — Up and down all the way. It is down, grade for about 200 yards coming into Ringwood station. They shut off ; steam about a quarter of a mile away, and come in at a good pace. They generally put on 15 pounds of steam while they are in the station. Mr Ferguson : Had the driver the usual load on ? — Yes ; about the usual load. Witness added that he had known the driver personally for about 10 years, and he had always been a careful, steady, sober man. He did not know the fireman so well. John Palmer, porter at Ringwood station, also saw the explosion. He was attending to the train on its arrival. He was knocked down by the force of the explosion. When he got up he saw the engine driver being carried into the office covered in blood. He noticed nothing peculiar about the driver and fireman, nor about the engine. Mr McLean : How far were you from the engine when you were knocked down ? — From ten to fifteen yards. William Paul, the guard of the train to which the injured locomotive Was attached, said he was looking at the engine at the very moment the explosion occurred. It seemed to come from exactly under the dome. The force of it took him off his feet. He was about 15 yards from the tender. When he rose he tried to reach the engine, but could not do so on account of the steam and coal dust. He called out to know whether any of the passengers were injured, and got no response, so that he concluded they were all right. All the lamps but about half dozen were extinguished by the force of the explosion, although the glass was not broken. He could testify most distinctly that the driver and fireman were both sober. The driver was a man who never drank. The steam started to blow off about a minute and a half before the explosion took place. The last place at which the engine took water was Healesville. The Chairman : Do yon know anything of the quality of the water there ? Is it creek water ? — Yes ; it comes from the Graceburn River. You never heard of its quality ?— No. How long have you known this engine on the road— About 13 months. Hew long have you known the driver on this line ? — About six weeks. I have known the fireman several years. The driver was a strict teetotaller, and I never saw the fireman take anything to drink in his life. Mr T. H, Woodroffe, chief mechanical engineer of the Victorian Railways, produced a report he had written to the secretary, about this explosion. The document gave facts concerning the engine and the explosion. It stated that the rapture seemed to have occurred at the rim of the plates adjoining the fire box. The engine was built at the Phoenix Foundry, Ballarat, in 1883. It was repaired at various times, the last time being in July of last year when it was sent to the Port Melbourne shops, and was then tested to a cold water pressure of 195 and found all right. It was the custom to overhaul all locomotives about every five years. The Chairman : There were no very heavy repairs in July, 1893; were there? — Not to the boilers. The shop manager's report says that the plug and safety tap holes were repaired, five new copper studs put in firebox, ash-pan door repaired, tender cleaned and overhauled, and studs re-rivetted, and boiler tested to pressure of 195, cold water. Mr Woodroffe read the report of the repairs effected to the boiler in December, 1888. That would be the time the plate was put in the boiler. On that occasion three new plates were put in the bottom and the boiler tested up to 195. The Chairman: Do you keep a record of the water used ?— Yes, the water in this case, I think, came from the Maroondah scheme. Mr Woodroffe said boilers were examined front time to time in the running sheds. In his opinion every possible care had been taken to keep the engine in proper care. There might, however, be lessons learnt from this. The Chairman: No doubt. From his examination of the plates [the] witness did not think the state of them could have been detected from the outside. There were no signs of leakage or sweating or anything of that sort. The next witness- was Walter Stinton, workshop manager at Newport and he said that the injured engine had been repeatedly repaired under his charge. He gave a technical account of the repairs effected on various occasions. The testing of locomotives was under his special notice. They had a high pressure pipe running; round the works, and a pump set at 2001b. When the boiler was pumped full of water the pressure when applied up to 1951b. The board appointed by the department to inquire into the Ringwood locomotive boiler explosion sat again at Spencer street on 25th inst. Mr R. Fulton presided and the other members of the board were. Mr Mephan Ferguson and Mr C. W. McLean. Charles Grubb, foreman of the boiler-makers at the Newport workshops, said he had inspected the pieces of plate that had been blown out of the engine, and after examining them, pointed out to the Chief Mechanical Engineer the portion where the plate had started to burst. It was under the lap, on the right hand side of the boiler. The grooving might be accounted for by bad water. During the past twenty years he had examined all the boilers that came into the Williamstown workshops, and while some were hardly marked at all, others were very badly eaten away. The practice was to cut out the defective portions. In this case the boiler was repaired in a similar manner. The Chairman : Can you suggest any other way of repairing so as to prevent accident ? — No, unless by taking out a plate on one side from the joint, and carrying it further up so as to avoid the joints meeting, or by taking out the plate altogether. What would.be the cost .of putting in a new " plate I—Perhaps about double the price; but I wouldn't recommend that course. It would be putting a new plate against plates that have been in use ten years or so and that would not be advisable. I think the present system better. I consider the present system of repairing the best. This is the first we have had so bad like that, to my knowledge. You attributed this to bad water. Is there no other probable cause ? — Well; unless the iron be bad. This was Lowmoor iron. I think this accident was caused by the eating away of plates. This one was the worst I have seen, for the short time it had been running. We use three classes of iron — Lowmoor, Monkbridge and Bowling. By Mr Woodroffe (Chief Mechanical Engineer) ; There are engines still running that were repaired at the same time as this one, in 1888, and. in the same way. These are engines 339 and 333. They have been recently examined and are in splendid order. What in your experience, is the age of a boiler on the Victorian railways? — From 17 to 20 years our earlier boilers stood. The later boilers don't stand so well. How is that? — There is difference in construction, and the material is lighter. The old boilers had thicker plates. Have you been asked in any way to curtail boiler affairs? — No, sir; nor in any way. You have never hesitated to carry out any necessary repairs? — Never. Our orders have been to exercise every care in examining, repairing and renewing boilers. Witness said that his practice was when an engine came into the workshop to find out how long she had been running. If over five years, he informed the workshop manager, and they thought it necessary the tubes were taken nut. If everything was in good order witness reported to the manager. The cost of taking out the tubes and putting them in again was about L20. Mr Woodroffe : Have you ever hesitated to repair a boiler on the score of expense ? — No, never. Mr McLean : Hew do yon ascertain whether a boiler requires repairs?— I keep a record of every boiler examined. From every boiler that comes in I have the dome covers taken off, and when it is practical I get inside. l can almost tell from the top of a boiler what the bottom is like. If there is any doubt about it I have the tubes taken out. If I have suspicion of defective plate I cause to have bored a triangle in the plate at the point where there is the most wear. There is a travelling inspector who visits all the running sheds of the colony except Port Melbourne and tests the boilers. He reports to us and we note what he points out. Alfred Thompson, locomotive inspector of the eastern section, said he knew this engine, 297R. He read a list of her repairs. He heard of the accident on Saturday night and went up to Ringwood. The Chairman : Did you ever notice anything peculiar about the engine? — No, I considered her A1 and would not have hesitated to have put on 140lb pressure owing to the repairs she had undergone. Witness considered that the explosion was caused by the expansion and contraction of the plates ; and, no doubt, the plate had been eaten away through bad water. The other side of the boiler showed: signs of corrosion: By Mr Woodroffe ; Is every care taken with the boilers ? — Yes, every possible care is taken for the safety of boilers, Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 7 EXPLOSION OF A LOCOMOTIVE BOILER, NARROW ESACPE FROM FATALITIES. THE DAMAGED ENGINE. [See drawing of loco – saved in “Railways” folder] The explosion of a locomotive boiler at Ringwood on Saturday evening, formed the subject of much discussion in railway circles on Monday. The Minister arrived at the office at an unusually early hour and immediately entered into a consultation with the acting chairman, Mr Kibble, and Mr Commissioner Murray. As the result of the interview it was resolved to ask three gentlemen of acknowledged engineering experience to sib as a board with the . object of inquiring into the cause of the accident and furnishing a report. Mr Richardson and the Commissioners are tally seized of the importance of having a searching investigation into the accident, and, with Mr Murray, the former went to Ringwood to inspect the scene of the disaster. They will he accompanied by Mr Woodroffe. During the morning no official report had come to hand from the driver or fireman of the engine in reference to the accident, but that is thought to be due to the circumstance that they have not sufficiently recovered to be able to give a circumstantial account of what occurred. The engine was one of the old R's, and, Mr Kibble pronounced them to be about the best class of engines used. So far nothing can be said as to the probable cause of the accident, as the broken plating of the engine has not been submitted to the inspection of experts. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 7 STATEMENT BY THE FIREMAN. This morning Thomas Miles, fireman on the engine the boiler of which exploded on Saturday night, is suffering from an injury to the spine, as well as a very severe shaking to the system. He states that he was fireman on the engine attached to the train which left Healesville on Saturday evening, at ten minutes to 8. Everything went all right until Ringwood was reached, when, .just as the train was about to continue its journey, a load explosion took place and Miles remembers nothing more until he was picked np on the platform ; and found himself suffering from a pain in the back, and an injury to his arm. He cannot think of any reason which could have caused the explosion, as there was plenty of water in the boiler, and everything seemed working all right. Mr R. Fulton, consulting engineer, of Queen street; Mr McLean, a member of the Marine Board ; and Mr Mephan Ferguson, engineer, have consented to act as a board to inquire into the cause of the engine boiler explosion at Ringwood on Saturday evening. The board has been appointed under section 117 of Act 1135, which provides that the Governor-in-Council may direct the taking of a such a step. Mr1 Fulton will act as chairman of the board, which met for the first time at the railway offices, Spencer street, this forenoon. Before separating the members of the Board paid a visit to the Prince's Bridge locomotive sheds in company with Mr Woodroffe, the chief mechanical engineer, for the purpose of inspecting the shattered boiler. It has been stated that the explosion is known to have been caused by a flaw in a plate which was put on the boiler about four years ago, but enquiries have tailed to elicit anything in support of that view. The engineers connected with the department are not inclined to say anything on the subject. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 14 April 1894, page 20 The Ringwood Boiler Explosion, The Minister of Railways has received the supplementary report of the board appointed by him to investigate the circumstances connected with the explosion of a locomotive boiler at Ringwood. In their first report the board did not attach blame to anyone. Mr Richardson felt satisfied that the responsibility of having the engines properly inspected and overhauled periodically could be fixed if the inquiry were extended. He therefore referred the matter again to the Board, who took further evidence. In the report now furnished, the Board hold Loco. Inspector Thompson blameable, but point out as a mitigating circumstance that he had not received "written instructions" respecting inspections and overhauls. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 7 July 1894, page 32 The Ringwood Boiler Explosion. The Minister of Railways takes exception to the tone of a paragraph appearing in a morning contemporary respecting the Ringwood boiler explosion. It makes it appear that Mr Richardson has referred the report of the board which considered the facts connected with the explosion to the Crown solicitor simply because he differed from the finding of the board. The Minister explains that when he received the report he found that the responsibility for having boilers properly inspected and overhauled had not been clearly fixed. He personally obtained farther evidence on that point, and arrived at a conclusion, from which the commissioners differed. As he did not like to take upon himself the responsibility of deciding upon the effect of the evidence, he submitted the matter to the Crown Solicitor, but that officer did not furnish him with the information sought. He has, therefore, referred the question to the Attorney-General, together with the draft of a regulation respecting boiler inspections and overhauls in the future. Mr Richardson says that his whole aim is to have the responsibility positively fixed. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 28 April 1894, page 23 The Minister of Railways has completed his consideration of the supplementary report received by him from the Ringwood Boiler Explosion Board. The report, it will be remembered, held Loco-Inspector Thompson blameable for the non-inspection of the boiler, but considered there was extenuating circumstances. There was a certain amount of doubt as to the absolute instructions given for overhauling engines periodically. Mr. Richardson is sending the report on to the Commissioners with instructions that the responsibility respecting inspection of boilers shall be made clear for the future. -
Ringwood and District Historical Society
Photograph, Ringwood, steam engine D 728. c 1902 {Croydon train}
Black and white photographs {2 copies - 1 large, 1 small}Written on rear of backing sheet, "Ringwood, steam engine D 728". -
Port of Echuca
Functional object - Paddlesteamer, Permewan,Wright Co Ltd, P.S. Pevensey, 1910
PS Pevensey was the last vessel to be built on the Moama slipway in 1910. it was originally built as the barge Mascotte a year earlier. It is powered by a 20hp Marshall and Sons steam engine and was first used on the Murrumbidgee River where it collected wool bales and brought them back to Echuca where they were loaded onto trains and taken to Melbourne for shipping overseas. The PS Pevensey was named after the Pevensey Station on the Murrumbidgee River. In the 1950's it travelled to South Australia where it survived being burnt and sunk but continued to keep working in the agricultural industry. It was sold to the Port of Echuca in 1973 where it was restored over 3 years and is still the largest vessel operating from the Echuca Wharf. In 1982, it was temporarily renamed The Philadelphia, and starred in the TV mini series " All The River's Run" based on the books by Nancy Cato. In 1985 Prince Charles and Lady Diana visited Echuca and cruised on the PS Pevensey, although it was labelled PS Philadelphia for the occasion. It is the largest vessel operating from the Echuca wharf as it can carry 90 passengers or 120 tons of cargo. PS Pevensey is a Murray River paddle steamer from 1910 and was built at Moama in NSW opposite the Port of Echuca. It was one of the largest towing and cargo paddle steamers on the river and was known as "the great Clydesdale" of the river. PS Pevensey remained operating on the river until 1958 after a number of years lying dormant it was purchased in 1973 and restored at Echuca. It began operating again in 1976 and it is still taking trips. it is one of a small number that still operates in its cargo carrying layout and with its original reconditioned engine. Coming back to Echuca PS Pevensey brought Kevin Hutchinson OAM to work at the Port of Echuca for the rest of his life.A side wheeled paddle steamer. Originally built as a barge the barge Mascot in 1909. Rebuilt as the PS Pevensey a year later in 1910.Pevensey labelled on the wheelhouse..wool bales, murrumbidgee river, all the rivers run, pevensey station, port of echuca wharf, prince charles and lady diana, the barge mascotte, kevin hutchinson. -
Sunbury Family History and Heritage Society Inc.
Photograph, Elwyn Davis, Pedestrian Bridge, C1990s
The wooden pedestrian bridge spanned the rail tracks at Sunbury Railway Station and were replaced with a more modern bridge and ramp when upgrades were done at the station and along the Bendigo line in the late 1990s and early 2000s. The water tank beyond the station building was used to refill the engines with water when steam engines were used. Diesel driven V Line trains now convey commuters from the regional towns along the Bendigo region to Melbourne.The Bendigo Line was the first government rail line to open and it reached Sunbury in 1859. It was extended to Bendigo and opened in 1861.A non-digital coloured photograph of a wooden pedestrian bridge spanning rail tracks with a wooden station building and former water tower on the station platform. rail bridges, bendigo rail line, sunbury station, water towers, railways -
Moorabbin Air Museum
Document (Item) - CA-31 Operational Trainer Engineering Report AA-155
... learning curve for student pilots advancing from piston engined CAC... learning curve for student pilots advancing from piston engined CAC ...The production Mirage1110 aircraft delivery commenced from the major contractor, the GAF, to the RAAF in March 1964. The secondary contractor to the Mirage project, the CAC, realising the need for a fast jet "lead in" training aircraft, and the only such type in the 1960s, being the supersonic T-38 that was originated for the USAF's F-5 aircraft in service, presented their proposed design for a locally designed and manufactured low cost supersonic training aircraft that would meet the flying and weapons training requirements of the RAAF to the powers that be in 1967. The rationale behind the proposal was the technological advances of aircraft such as the Mirage creating a less than satisfactory learning curve for student pilots advancing from piston engined CAC Winjeel basic trainers through to first generation sub-sonic deHavilland jet trainers into the world of high technology "fast jet" fighter aircraft operation. The original design featured a tail plane less fuselage and a double delta wing to be powered by a General Electric – J85 turbojet engine that was later seen to have a fuel consumption that would unduly impinge on the range and endurance of the aircraft and the design, that had advanced to the stage of constructing a full size mockup, was revised to incorporate the Rolls Royce RB172-T-260 turbojet engine. The aircraft would feature two zero zero Martin Baker ejection seats and be capable of carrying a load of 1815 kg on four wing and two fuselage hardpoints, and be capable of a maximum speed of Mach1.5 at altitude and very high subsonic speeds at low level. In the event, the design was not proceeded with and work ceased at the end of 1970 as the RAAF were going to receive the dual seat trainer version of the Mirage, the 111D, from 1973, and the RAAF initial jet trainer requirement advanced from the deHavilland Vampire to the Aermacchi MB326H aircraft built by the CAC under license in 1967. The CA-31 mock up survived and was donated to the Museum in mid 1974CAC designed supersonic trainer