Administrative record - City of Sunshine - Commissioner Mr Alexander Alex George Gillon Collection 1976 - 1982 - Report of the committee meetings 18th August 1980, City of Sunshine, 18th August 1980

Archive (collection) - Commissioner Mr Alexander Alex George Gillon Collection

Physical description

Foolscap sized document.

Inscriptions & markings

Report of the Works Committee Meeting
Because of Wet Weather on concrete work was untaken on 15th August 1980
Kerb & Channel Fisher Street Maidstone North side completed, South side 40% complete
Kerb & Channel Duke Street Sunshine bus bays completed and kerb & channel complete to Carlton Street
Footpath Cordite Avenue completed
Footpath Ballarat Road (Omar Street) commenced
Footpath Braybrook Area gang moving to area south of Ballarat Road and West of Ashley Street
Footpath Billingham Road Deer Park access to Ballarat Road commenced
Footpath Hampshire Road work has been delayed as Telecom requires to lay conduits
Drainage Sunshine Road Tottenham rock slowing progress
Road Work Duke Street Sunshine West side, Hertford Road to Staughton Street in progress
Road Work Forrest Street Albion to Kororoit Creek 50% complete
Downing Street Sunshine North small drain constructed to relieve flooding
45 Warmington Road Sunshine West slab poured
Sassella Park inspection has indicated that water is a result of the closeness of rock to the surface
Munro Street / Ralston Avenue Sunshine North Drain completed
Ralph Street Reserve ready for top dressing, soil on site
Kinder Smith Reserve to be top dressed, soil on site
Ainsworth Reserve to be top dressed
Dempster Park synthetic surface for practice wickets has been ordered
I.C.I. Ground Deer Park Cricket Club is prepared to use another site while the area is being reconstructed
Tree Planting work progressing in Central Sunshine, E. Shepherd Gardens & Highpoint West Child Care Centre
Tree Pruning 75% complete, excluding jobs which require a travel tower and the list from the S.E.C.V.
Railway Estate Tottenham a further 280 trees required to replant this area
Albion Tennis Pavilion constructed estimated to be complete this week
Aycliffe Avenue Infant Welfare & Pre-School Centre construction estimated to be completed this week
Depot Workshop work stopped due to weather conditions
Municipal Offices sub grade laid. Plan to be modified to include a shower
Scovell Reserve Building $3,000 worth of work to be completed
Castley Hall renovations are in progress
Sunshine Croquet Club extension to the W.C. facilities is in progress
Sunshine Bowling Club replacement floor has commenced

Report of the Finance Committee Meeting

Report of the Town Clerk
Sanitary & Interest Adjustments / Abandonments
National Wage Decision Variations to M.E.U. Award Payment of Increase
Rates, Sanitary & Interest Statements as at 28th July 1980
Swimming Disable

Report of the City Engineer & Planner
1980/81 Estimates Priorities for Staff Expenditures
Harrison Street / Miles Street Deer Park Private Street Scheme
Proposed Purchase of Land
Traffic Route Lighting (Various Locations)
Albion Tennis Club Pavilion
Dempster Park Canteen
Sunshine Football Club Loan
The Hunt Club Hotel Buildings 1980/81 Building Repair Budget

Back to top